Because they all use the illegal Colossus 2 data centre from SpaceX/XAi/fascism central and that data centre went down.
Google, Anthropic, and OpenAI all have contracts with them.
When that illegally running environmental disaster of data centre goes down, all those services all go over capacity and you get 502 rate limit errors.
And where is said data center? For research purposes
https://epoch.ai/data/ai-data-centers/directory/colossus-2 says “Memphis, Tennessee, United States” but also provides satellite imagery
The numbers of this madness are fucking scary, 1.5 GW of compute power, and huge arrays of cooler to keep it operating. It’s basically a 1.5GW heater in the open. Oh and gas turbines to provide (part of) the electricity. Capitalism is burning this world down for a buck.
We can’t really produce enough heat through industry to affect the earth globally, if that’s what you meant. It’s insignificant in comparison to what the Sun provides.
However there is undeniably localised issues caused by these insane structures.Probably the gas turbines producing C02 and waste methane.
Does that mean Musk’s businesses have access to everything people do on the systems that use their data centers?
Generally no, because most hosting companies would have something baked into SLA/SLO contracts, but all of this shit is done so illegally and shadily now, I wouldn’t put a hard “no” on that possibility.
Nobody can verify that those “contracts” are actually being honored. We are all assuming the fascists will self police themselves out of good will.